Extrema Outdoor

Together with the generator supplier, a set of 3 gensets were placed on a strategical place at Extrema Outdoor 2013. By applying this strategy, only one machine was used for the biggest part of the festival. The more power was needed, the more machines got turned on.

After the success of the first edition, this strategy was applied to almost every power zone in 2014, 2015 and 2016. Read more at the post ‘Solar Weekend’.

Extrema Outdoor